ADDING FLOOR AT THE GRAND HYATT HOTEL

Addition of metal floor for use as a restaurant at the GRAND HYATT hotel
of 750m2 total area
Budget: €2,500,000
Contractor: VITAEL
Construction: 2023

Addition of metal floor for use as a restaurant at the GRAND HYATT hotel
of 750m2 total area
Budget: €2,500,000
Contractor: VITAEL
Construction: 2023